Construction Report
Select Location
  
Updated: 5/23/15 10:03 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

I-94 EB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
50th Rd to 58th Rd 331.9 to 334.9 Medium Various lanes closed 3/20/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
Exit ramp to WB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 7/2/15 11:45 PM WisDOT Construction - Detour: Use I-94 EB (SB) to County K to West Frontage Road to WIS 20; *** Long Term Closure ***
at WI-20 333.1 Medium Right lane closed, two lanes open 3/21/15 8:00 AM to 11/30/15 11:59 PM WisDOT *** Long Term Closure ***
Entrance ramp from EB WI-20 332.7 Major All lanes and shoulders closed 3/20/15 12:00 AM to 11/24/15 11:45 PM WisDOT Construction - Detour: Use WIS 20 to West Frontage Road to 58th Road to West Frontage Road to WIS 11 to I-94 EB (SB); *** Long Term Closure ***

I-94 WB (Wisconsin)
Location Mile Marker Severity Closure Details Time Periods Source Description
at Old Highway 11 334.9 Minor Right lane closed, two lanes open 3/12/15 12:00 AM to 11/25/15 11:45 PM WisDOT Construction - N-S FREEWAY, STH 20 INTERCHANGE | MAINLINE & RAMPS | I 94 | RACINE
at WI-20 333.1 Medium Right lane closed, two lanes open 3/12/15 6:00 AM to 11/30/15 11:59 AM WisDOT *** Long Term Closure ***
Exit ramp to EB Howard Ave 315.2 Medium All lanes and shoulders closed 2/15/15 12:00 AM to 8/31/15 11:45 PM WisDOT Construction - Detour: Exit to Holt Ave and follow posted detour
at Holt Ave (+0.1 miles) 314.3 Major All lanes and shoulders closed 5/11/15 12:00 AM to 6/1/15 11:45 PM WisDOT Construction - Detour: Follow posted detour signage to Holt Ave, and use Holt Ave entrance ramp to NB 43
Exit ramp to EB Lapham Blvd 313.0 Medium All lanes and shoulders closed 1/12/15 12:00 AM to 9/30/15 11:45 PM WisDOT Construction - Detour: Use alt route (continue north on 4th St to Lapham Blvd)
64th St to WI-181 (+0.2 miles) 306.6 to 305.1 Medium Left lane closed, two lanes open 12/6/14 12:00 AM to 12/5/15 11:45 PM WisDOT Construction - ZOO IC, ZOO INTERCHANGE PHASE 1 | LINCOLN - BLUEMOUND, 121ST - 70TH | USH 45 | MILWAUKEE
Exit ramp to WB Oconnor St 305.5 Medium All lanes and shoulders closed 10/13/14 12:00 AM to 6/15/15 11:45 PM WisDOT Construction - Detour: Take 68th-70th st exit, continue W on O'Conner, North on 76th st, West on Bluemound to 84th st (North 84th st Detour). Take 68th-70th exit, Continue West, South on 70th, West on Greenfield to 84th st. (South 84th st Detour).
Exit ramp to EB I-894 304.6 Major All lanes and shoulders closed 3/9/15 12:00 AM to 8/26/17 11:45 PM WisDOT Construction - Detour: I-94 to 70th St to Greenfield to the I-894/US 45 South Ramp And I-94 to HWY 100 to Greenfield to the I-894/US 45 South Ramp And I-94 to Moorland to Greenfield to the I-894/US 45 South Ramp

Site Contributors | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use of cookies and JavaScript.
Sat May 23 2015 11:20:34 CDT