|
Use the links below to view other reports for the selected location:
travel times /
incidents /
construction /
special events /
congestion /
dynamic message signs /
cameras /
detectors
NOTE: You may place the mouse over a location to see its municipality and county,
or click on the location to see a map of the event.
I-39 NB (Regional)
| at I-88
|
97.1 |
Medium |
Various lanes closed |
05/09/13 06:00 AM to 06/28/13 11:59 PM |
IDOT |
Max width 12' 6" starting 5/28/13
|
| at South Junction I-39/90/US-51
|
17.3 |
None |
All lanes and shoulders open |
03/28/13 07:00 AM to 12/31/14 11:59 PM |
IDOT |
Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in |
| CR-O to Palmer Dr
|
175.5 to 174.6 |
Medium |
Left lane closed, one lane open |
06/20/13 11:00 PM to 06/21/13 05:00 AM daily until 06/27/13 |
WisDOT |
Construction - Detour: NONE |
| Exit to NB US-51
|
160.4 |
Major |
All lanes and shoulders closed |
06/19/13 08:00 PM to 06/20/13 05:00 AM daily until 06/20/13 |
WisDOT |
Construction - Detour: N/A |
| Milwaukee St to US-51
|
138.5 to 132.2 |
Medium |
Various lanes closed |
06/16/13 10:00 PM to 06/21/13 05:00 AM, 06/23/13 10:00 PM to 06/28/13 05:00 AM, 06/30/13 10:00 PM to 07/05/13 05:00 AM, 07/07/13 10:00 PM to 07/12/13 05:00 AM, ... more, ending on 08/18/13 |
WisDOT |
Construction - Detour: N/A |
| CR-I to CR-I
|
126.3 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/19/13 09:00 PM to 06/20/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |
| CR-I to CR-I
|
126.3 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/20/13 09:00 PM to 06/21/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |
I-39 SB (Regional)
| CR-DM to CR-I
|
124.6 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/19/13 09:00 PM to 06/20/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |
| CR-DM to CR-I
|
124.6 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/20/13 09:00 PM to 06/21/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |
| WI-19 to Lien Rd
|
130.7 to 136.8 |
Medium |
Various lanes closed |
06/16/13 10:00 PM to 06/21/13 05:00 AM, 06/23/13 10:00 PM to 06/28/13 05:00 AM, 06/30/13 10:00 PM to 07/05/13 05:00 AM, 07/07/13 10:00 PM to 07/12/13 05:00 AM, ... more, ending on 08/18/13 |
WisDOT |
Construction - Detour: N/A |
| Palmer Dr to CR-O
|
174.7 to 175.5 |
Medium |
Left lane closed, one lane open |
06/20/13 11:00 PM to 06/21/13 05:00 AM daily until 06/27/13 |
WisDOT |
Construction - Detour: NONE |
| at South Junction I-39/90/US-51
|
17.3 |
None |
All lanes and shoulders open |
03/28/13 07:00 AM to 12/31/14 11:59 PM |
IDOT |
Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in |
| at I-88
|
97.0 |
Medium |
Various lanes closed |
05/09/13 06:00 AM to 06/28/13 11:59 PM |
IDOT |
Max width 12' 6" starting 5/28/13
|
| Entrance from WB I-88
|
96.9 |
Major |
All lanes and shoulders closed |
05/28/13 07:00 AM to 06/28/13 11:59 PM |
IDOT |
Ramp closed |
I-80 EB (Regional)
| at Over the Mississippi River
|
0.2 |
Medium |
Various lanes closed |
03/04/13 06:00 AM to 10/31/13 11:59 PM |
IDOT |
Traffic lane will be reduced to one lane in each direction::
12'-0" - Maximum Width - Eastbound Only - Effective 03/18/2013 through 04/12/2013
12'-0" - Maximum Width - Westbound Only - Expires 03/29/2013
|
| at Over the Mississippi River
|
0.2 |
Medium |
Various lanes closed |
04/08/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Traffic will be reduced to one lane in each direction due to maintenance::12'-0" - Maximum Width - Effective 04/08/2013 through 04/26/2013 |
| Exit to WB I-280
|
9.4 |
Minor |
All lanes and shoulders open |
05/28/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Max width: 12' 0 " |
| Exit to WB I-280
|
9.4 |
Minor |
Various lanes closed |
05/28/13 07:00 AM to 07/26/13 11:59 PM |
IDOT |
Max width 12 ft 0 in |
| Backbone Rd (+0.4 miles) to 2400 St (+0.6 miles)
|
55.0 to 61.0 |
Medium |
Various lanes closed |
03/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Max width 15 feet 6 inches. One lane closed. |
| Kendall County Line to I-294
|
122.7 to 154.5 |
Medium |
Left lane and both shoulders closed, one or two lanes open with ramp work, possible width reduction |
06/20/13 09:00 AM to 02:30 PM |
IDOT |
Moving Operation |
| at Shepley Rd
|
123.4 |
Minor |
Left shoulder closed, all lanes open |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
|
| at River Rd
|
125.2 |
Minor |
Left shoulder closed, all lanes open |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
|
| Exit to US-30
|
137.4 |
Minor |
Ramp work, possible width reduction |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure*** |
| at US-30
|
137.7 |
Minor |
Both shoulders closed, all lanes open |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure*** |
| Entrance from US-30
|
137.4 |
Minor |
Ramp work, possible width reduction |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure*** |
| Entrance from SB I-355
|
142.4 |
Minor |
Ramp work, possible width reduction |
06/19/13 07:00 PM to 06/20/13 05:00 AM |
Illinois Tollway |
Pavement Striping; Left Side Ramp Closed |
| Will County Line to I-294
|
148.8 to 154.5 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operation |
| Exit to I-90
|
15.2 |
Medium |
All lanes and shoulders open |
03/14/11 07:00 PM to 01/06/14 11:59 PM |
Indiana Toll Road |
Lake Station - EB Exit from 80/94 to ITR Bridge: No lanes closed, 14 ft width restriction |
| I-94 (-0.1 miles) to Mccool Rd (+0.4 miles)
|
21.2 to 26.2 |
Medium |
Right lane closed, one lane open |
06/19/13 08:00 PM to 06/20/13 01:00 PM |
Indiana Toll Road |
Mill and Fill |
| I-94 to Mccool Rd
|
21.2 to 26.2 |
Medium |
Left lane closed, one lane open |
06/20/13 08:00 PM to 06/21/13 01:00 PM |
Indiana Toll Road |
Mill and Fill |
| Ramp from EB I-80/90 (Indiana Toll Road) to Travel Plaza 1
|
21.5 |
Minor |
Ramp work, possible width reduction |
06/19/13 08:00 PM to 06/20/13 01:00 PM |
Indiana Toll Road |
Mill and Fill; Exit/Entry lanes reduced |
| Ramp from Travel Plaza 1 to EB I-80/90 (Indiana Toll Road)
|
21.8 |
Minor |
Ramp work, possible width reduction |
06/19/13 08:00 PM to 06/20/13 01:00 PM |
Indiana Toll Road |
Mill and Fill; Exit/Entry lanes reduced |
| IN-331 to County Road 13
|
83.0 to 94.0 |
Medium |
Left lane closed, one lane open |
06/20/13 07:00 AM to 12:00 PM |
Indiana Toll Road |
Paint Striping; Moving Operation |
| IN-331 to County Road 13
|
83.0 to 94.0 |
Medium |
Right lane closed, one lane open |
06/20/13 12:00 PM to 05:00 PM |
Indiana Toll Road |
Paint Striping; Moving Operation |
| 1150 to 1000
|
108.8 to 109.8 |
Medium |
Right lane closed, one lane open |
06/20/13 06:00 PM to 06/21/13 06:00 AM |
Indiana Toll Road |
Mill and Fill |
| 700 (+0.3 miles) to 700 (+0.5 miles)
|
153.0 to 153.2 |
Medium |
Left lane closed, one lane open |
06/19/13 07:00 AM to 06/20/13 07:00 AM |
Indiana Toll Road |
Deep Patching |
I-80 WB (Regional)
| County Road 600 (-0.2 miles) to 550 (-0.3 miles)
|
151.6 to 151.0 |
Medium |
Left lane closed, one lane open |
06/19/13 07:00 AM to 06/20/13 07:00 AM |
Indiana Toll Road |
Deep Patching |
| County Road 650 to IN-327
|
137.0 to 134.8 |
Medium |
Left lane closed, one lane open |
06/20/13 07:00 AM to 06/21/13 07:00 AM |
Indiana Toll Road |
Deep Patching |
| Primrose Rd to Sycamore Rd
|
70.3 to 68.0 |
Medium |
Right lane closed, one lane open |
06/17/13 12:00 AM to 06/20/13 06:00 AM |
Indiana Toll Road |
Mill and Fill |
| Hamilton Trl (-1.0 miles) to Timothy Rd (+0.1 miles)
|
64.7 to 62.7 |
Medium |
Right lane closed, one lane open |
06/18/13 06:00 PM to 06/20/13 06:00 AM |
Indiana Toll Road |
Mill and Fill |
| at County Road 200 E
|
32.0 |
Medium |
Left lane and left shoulder closed, one lane open |
06/20/13 09:00 AM to 07:00 PM |
Indiana Toll Road |
Bridge Painting |
| Exit to EB I-94
|
21.1 |
Medium |
All lanes and shoulders open |
01/03/11 07:00 AM to 01/06/14 11:59 PM |
Indiana Toll Road |
No lanes closed, Exit 21 WB 12 ft width restriction |
| I-294 to Will County Line
|
154.4 to 148.8 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operation |
| I-294 to Kendall County Line
|
154.5 to 122.7 |
Medium |
Left lane and both shoulders closed, one or two lanes open with ramp work, possible width reduction |
06/20/13 09:00 AM to 02:30 PM |
IDOT |
Moving Operation |
| Cicero Ave to Harlem Ave
|
152.2 to 148.8 |
Minor |
Right shoulder closed, all lanes open with ramp work, possible width reduction |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operation |
| at US-30
|
137.7 |
Minor |
Both shoulders closed, all lanes open |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure*** |
| Exit to US-30
|
137.7 |
Minor |
Ramp work, possible width reduction |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure*** |
| Entrance from US-30
|
137.7 |
Minor |
Ramp work, possible width reduction |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure*** |
| at Larkin Ave
|
130.6 |
Minor |
Left shoulder closed, all lanes open |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
|
| at River Rd
|
125.2 |
Minor |
Left shoulder closed, all lanes open |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
|
| at Shepley Rd
|
123.4 |
Minor |
Left shoulder closed, all lanes open |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
|
| 2400 St (-0.6 miles) to Backbone Rd (-0.4 miles)
|
61.0 to 55.0 |
Medium |
Various lanes closed |
03/01/13 07:00 AM to 09/30/13 11:59 PM |
IDOT |
Max width 15 feet 6 inches. One lane closed. |
| at Over the Mississippi River
|
0.2 |
Medium |
Various lanes closed |
03/04/13 06:00 AM to 10/31/13 11:59 PM |
IDOT |
Traffic lane will be reduced to one lane in each direction::
12'-0" - Maximum Width - Eastbound Only - Effective 03/18/2013 through 04/12/2013
12'-0" - Maximum Width - Westbound Only - Expires 03/29/2013
|
| at Over the Mississippi River
|
0.2 |
Medium |
Various lanes closed |
04/08/13 07:00 AM to 10/31/13 11:59 PM |
IDOT |
Traffic will be reduced to one lane in each direction due to maintenance::12'-0" - Maximum Width - Effective 04/08/2013 through 04/26/2013 |
I-90 EB (Regional)
| CR-DM to CR-I
|
124.6 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/19/13 09:00 PM to 06/20/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |
| CR-DM to CR-I
|
124.6 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/20/13 09:00 PM to 06/21/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |
| WI-19 to Lien Rd
|
130.7 to 136.8 |
Medium |
Various lanes closed |
06/16/13 10:00 PM to 06/21/13 05:00 AM, 06/23/13 10:00 PM to 06/28/13 05:00 AM, 06/30/13 10:00 PM to 07/05/13 05:00 AM, 07/07/13 10:00 PM to 07/12/13 05:00 AM, ... more, ending on 08/18/13 |
WisDOT |
Construction - Detour: N/A |
| Palmer Dr to CR-O
|
174.7 to 175.5 |
Medium |
Left lane closed, one lane open |
06/20/13 11:00 PM to 06/21/13 05:00 AM daily until 06/27/13 |
WisDOT |
Construction - Detour: NONE |
| at South Junction I-39/90/US-51
|
17.3 |
None |
All lanes and shoulders open |
03/28/13 07:00 AM to 12/31/14 11:59 PM |
IDOT |
Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in |
| Exit to Genoa Rd
|
25.2 |
Minor |
Ramp work, possible width reduction |
04/15/13 07:00 AM to 10/06/13 11:59 AM |
Illinois Tollway |
Shoulder Widening; Right Side Ramp Closed; ***Long Term Closure*** |
| Entrance from Genoa Rd
|
25.2 |
Minor |
Ramp work, possible width reduction |
04/15/13 07:00 AM to 10/06/13 11:59 AM |
Illinois Tollway |
Shoulder Widening; Right Side Ramp Closed; ***Long Term Closure*** |
| Exit to US-20
|
41.7 |
Medium |
Ramp work, possible width reduction |
04/25/13 06:00 AM to 07/20/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Pavement Reconstruction; ***Long Term Closure*** |
| Entrance from US-20
|
41.7 |
Medium |
Ramp work, possible width reduction |
04/25/13 06:00 AM to 07/20/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Pavement Reconstruction; ***Long Term Closure*** |
| Entrance from NB I-294
|
78.3 |
Minor |
Various lanes closed |
06/19/13 03:00 PM to 07/18/13 11:59 PM |
Illinois Tollway |
Pavement Repair; Shoulder Work; Right Cash, Right IPO Lanes Closed; ***Long Term Closure*** |
| East River Rd to Montrose Ave
|
79.1 to 43.5 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 11:00 AM to 02:00 PM |
IDOT |
Moving Operation |
| East River Rd to Foster Ave
|
3.0 to 83.1 |
Minor |
Right shoulder closed, all lanes open |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operation |
| Foster Ave to Kimball Ave
|
83.1 to 45.6 |
Minor |
Right shoulder closed, all lanes open |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
|
| Montrose Ave to Ohio St
|
43.5 to 50.3 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Exit to SEB Kennedy Reversibles
|
46.0 |
Major |
All lanes and shoulders closed |
06/20/13 12:00 AM to 06/21/13 05:00 AM |
IDOT |
Slip Ramp to EB Express Lanes at Diversey Closed For Repairs from 12:00 AM Thursday Morning to 5:00 AM Friday Morning |
| Exit to Ohio St
|
50.5 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Ohio St to I-290
|
50.3 to 51.6 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:30 AM to 02:00 PM |
IDOT |
Moving Operation |
| Entrance from Ontario St
|
50.1 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Exit to Adams St
|
51.2 |
Minor |
Ramp work, possible width reduction |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
|
| I-290 to 31st St
|
51.6 to 54.6 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| I-290 to 99th St
|
51.7 to 63.4 |
Medium |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operation; Local Lanes |
| Entrance from Cermak Rd
|
54.6 |
Minor |
Left lane and left shoulder closed, two or three lanes open with ramp work, possible width reduction |
04/08/13 09:00 PM to 09/20/13 11:59 PM |
IDOT |
On Chinatown Feeder; ***Long Term Closure*** |
| 39th St to 63rd St
|
55.6 to 58.7 |
Medium |
Left lane closed, two or three lanes open |
06/19/13 09:00 PM to 06/20/13 06:00 AM |
IDOT |
|
| 39th St to 63rd St
|
55.6 to 58.7 |
Major |
Left two lanes closed, one or two lanes open |
06/19/13 11:00 PM to 06/20/13 06:00 AM |
IDOT |
|
| IN-51 to IN-51 (+0.3 miles)
|
20.4 to 20.7 |
Medium |
Various lanes closed |
06/18/13 09:00 AM to 10/15/13 09:00 PM |
Indiana Toll Road |
Bridge Work; 2 lanes open at all times |
| I-94 (-0.1 miles) to Mccool Rd (+0.4 miles)
|
21.2 to 26.2 |
Medium |
Right lane closed, one lane open |
06/19/13 08:00 PM to 06/20/13 01:00 PM |
Indiana Toll Road |
Mill and Fill |
| I-94 to Mccool Rd
|
21.2 to 26.2 |
Medium |
Left lane closed, one lane open |
06/20/13 08:00 PM to 06/21/13 01:00 PM |
Indiana Toll Road |
Mill and Fill |
| Ramp from EB I-80/90 (Indiana Toll Road) to Travel Plaza 1
|
21.5 |
Minor |
Ramp work, possible width reduction |
06/19/13 08:00 PM to 06/20/13 01:00 PM |
Indiana Toll Road |
Mill and Fill; Exit/Entry lanes reduced |
| Ramp from Travel Plaza 1 to EB I-80/90 (Indiana Toll Road)
|
21.8 |
Minor |
Ramp work, possible width reduction |
06/19/13 08:00 PM to 06/20/13 01:00 PM |
Indiana Toll Road |
Mill and Fill; Exit/Entry lanes reduced |
| IN-331 to County Road 13
|
83.0 to 94.0 |
Medium |
Left lane closed, one lane open |
06/20/13 07:00 AM to 12:00 PM |
Indiana Toll Road |
Paint Striping; Moving Operation |
| IN-331 to County Road 13
|
83.0 to 94.0 |
Medium |
Right lane closed, one lane open |
06/20/13 12:00 PM to 05:00 PM |
Indiana Toll Road |
Paint Striping; Moving Operation |
| 1150 to 1000
|
108.8 to 109.8 |
Medium |
Right lane closed, one lane open |
06/20/13 06:00 PM to 06/21/13 06:00 AM |
Indiana Toll Road |
Mill and Fill |
| 700 (+0.3 miles) to 700 (+0.5 miles)
|
153.0 to 153.2 |
Medium |
Left lane closed, one lane open |
06/19/13 07:00 AM to 06/20/13 07:00 AM |
Indiana Toll Road |
Deep Patching |
I-90 Express EB (Regional)
| Entrance from Cermak Rd
|
54.6 |
Minor |
Left lane and left shoulder closed, two or three lanes open with ramp work, possible width reduction |
04/08/13 09:00 PM to 09/20/13 11:59 PM |
IDOT |
On Chinatown Feeder; ***Long Term Closure*** |
I-90 Reversible EB (Regional)
| Entrance from EB I-90
|
|
Major |
All lanes and shoulders closed |
06/20/13 12:00 AM to 06/21/13 05:00 AM |
IDOT |
Slip Ramp to EB Express Lanes at Diversey Closed For Repairs from 12:00 AM Thursday Morning to 5:00 AM Friday Morning |
I-90 WB (Regional)
| County Road 600 (-0.2 miles) to 550 (-0.3 miles)
|
151.6 to 151.0 |
Medium |
Left lane closed, one lane open |
06/19/13 07:00 AM to 06/20/13 07:00 AM |
Indiana Toll Road |
Deep Patching |
| County Road 650 to IN-327
|
137.0 to 134.8 |
Medium |
Left lane closed, one lane open |
06/20/13 07:00 AM to 06/21/13 07:00 AM |
Indiana Toll Road |
Deep Patching |
| Primrose Rd to Sycamore Rd
|
70.3 to 68.0 |
Medium |
Right lane closed, one lane open |
06/17/13 12:00 AM to 06/20/13 06:00 AM |
Indiana Toll Road |
Mill and Fill |
| Hamilton Trl (-1.0 miles) to Timothy Rd (+0.1 miles)
|
64.7 to 62.7 |
Medium |
Right lane closed, one lane open |
06/18/13 06:00 PM to 06/20/13 06:00 AM |
Indiana Toll Road |
Mill and Fill |
| at County Road 200 E
|
32.0 |
Medium |
Left lane and left shoulder closed, one lane open |
06/20/13 09:00 AM to 07:00 PM |
Indiana Toll Road |
Bridge Painting |
| Exit to EB I-94
|
21.1 |
Medium |
All lanes and shoulders open |
01/03/11 07:00 AM to 01/06/14 11:59 PM |
Indiana Toll Road |
No lanes closed, Exit 21 WB 12 ft width restriction |
| IN-51 (-0.3 miles) to IN-51
|
20.7 to 20.4 |
Medium |
Various lanes closed |
06/18/13 09:00 AM to 10/15/13 09:00 PM |
Indiana Toll Road |
Bridge Work; 2 lanes open at all times |
| Entrance from EB I-80
|
20.4 |
Medium |
All lanes and shoulders open |
03/14/11 07:00 PM to 01/06/14 11:59 PM |
Indiana Toll Road |
Lake Station - EB Exit from 80/94 to ITR Bridge: No lanes closed, 14 ft width restriction |
| US-41 (-0.1 miles) to Sheffield Ave
|
4.3 to 3.5 |
Medium |
Left lane closed, one lane open |
06/20/13 09:00 AM to 06:00 PM |
Indiana Toll Road |
Deep Patching |
| Ramp from NWB I-90 (Chicago Skwy) to Dan Ryan Express
|
|
Medium |
All lanes and shoulders closed |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
Entrance to Dan Ryan Express Lanes from Chicago Skyway closed - all traffic diverted to Local Lanes. **Long Term Closure** |
| Marquette Rd to 63rd St
|
59.3 to 58.7 |
Minor |
Left shoulder closed, all lanes open |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure in locals*** |
| 72nd St to 47th St
|
59.9 to 56.7 |
Medium |
Left lane closed, one to four lanes open |
06/19/13 08:00 PM to 06/20/13 05:00 AM |
IDOT |
|
| 72nd St to 47th St
|
59.9 to 56.7 |
Medium |
Left two lanes closed, up to three lanes open |
06/19/13 10:00 PM to 06/20/13 05:00 AM |
IDOT |
|
| 99th St to I-290
|
63.4 to 51.7 |
Medium |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operation; Local Lanes |
| 31st St to I-290
|
54.7 to 51.6 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Exit to EB I-290
|
52.4 |
Medium |
Ramp work, possible width reduction |
06/19/13 09:00 PM to 06/20/13 05:00 AM |
IDOT |
|
| I-290 to Ohio St
|
51.6 to 50.4 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 09:30 AM to 01:00 PM |
IDOT |
Moving Operation |
| Exit to Ohio St
|
50.7 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Ohio St to Montrose Ave
|
50.3 to 43.5 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 11:00 AM to 02:00 PM |
IDOT |
Moving Operation |
| Entrance from Ontario St
|
50.1 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Montrose Ave to East River Rd
|
43.5 to 79.2 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Foster Ave to East River Rd
|
83.1 to 79.1 |
Minor |
Right shoulder closed, all lanes open |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operation |
| Cumberland Ave (IL-171) to East River Rd
|
79.6 to 79.2 |
Minor |
Right lane closed, three lanes open |
06/19/13 11:00 PM to 06/20/13 05:00 AM |
IDOT |
|
| IL-23 to Shattuck Rd
|
36.0 to 29.2 |
Medium |
Right lane closed, one lane open |
06/20/13 05:00 AM to 11:00 AM |
Illinois Tollway |
Landscaping; Moving Operation |
| Exit to Genoa Rd
|
25.6 |
Minor |
Ramp work, possible width reduction |
04/09/13 07:00 AM to 10/06/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Landscaping; Material Storage; ***Long Term Closure*** |
| Entrance from Genoa Rd
|
25.6 |
Minor |
Ramp work, possible width reduction |
04/09/13 07:00 AM to 10/06/13 11:59 PM |
Illinois Tollway |
Right Side of Ramp Closed; Landscaping; Material Storage; ***Long Term Closure*** |
| Irene Rd to Mill Rd
|
20.8 to 17.7 |
Medium |
Right lane closed, one lane open |
04/17/13 05:00 PM to 10/06/13 11:59 PM |
Illinois Tollway |
Pavement Widening; Trqffic Shift; ***Long Term Closure*** |
| at South Junction I-39/90/US-51
|
17.3 |
None |
All lanes and shoulders open |
03/28/13 07:00 AM to 12/31/14 11:59 PM |
IDOT |
Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in |
| CR-O to Palmer Dr
|
175.5 to 174.6 |
Medium |
Left lane closed, one lane open |
06/20/13 11:00 PM to 06/21/13 05:00 AM daily until 06/27/13 |
WisDOT |
Construction - Detour: NONE |
| Exit to NB US-51
|
160.4 |
Major |
All lanes and shoulders closed |
06/19/13 08:00 PM to 06/20/13 05:00 AM daily until 06/20/13 |
WisDOT |
Construction - Detour: N/A |
| Milwaukee St to US-51
|
138.5 to 132.2 |
Medium |
Various lanes closed |
06/16/13 10:00 PM to 06/21/13 05:00 AM, 06/23/13 10:00 PM to 06/28/13 05:00 AM, 06/30/13 10:00 PM to 07/05/13 05:00 AM, 07/07/13 10:00 PM to 07/12/13 05:00 AM, ... more, ending on 08/18/13 |
WisDOT |
Construction - Detour: N/A |
| CR-I to CR-I
|
126.3 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/19/13 09:00 PM to 06/20/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |
| CR-I to CR-I
|
126.3 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/20/13 09:00 PM to 06/21/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |
I-94 EB (Regional)
| CR-DM to CR-I
|
124.6 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/19/13 09:00 PM to 06/20/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |
| CR-DM to CR-I
|
124.6 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/20/13 09:00 PM to 06/21/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |
| WI-19 to Lien Rd
|
130.7 to 136.8 |
Medium |
Various lanes closed |
06/16/13 10:00 PM to 06/21/13 05:00 AM, 06/23/13 10:00 PM to 06/28/13 05:00 AM, 06/30/13 10:00 PM to 07/05/13 05:00 AM, 07/07/13 10:00 PM to 07/12/13 05:00 AM, ... more, ending on 08/18/13 |
WisDOT |
Construction - Detour: N/A |
| Exit to EB I-894
|
304.1 |
Major |
All lanes and shoulders closed |
06/20/13 11:00 PM to 06/21/13 04:30 AM |
WisDOT |
Construction - Detour: From I-94 west exit and turn south on STH 100. From STH 100 turn east on W.Beloit Rd. From W.Beloit Rd. enter US 45 south. |
| Canal St to Lapham Blvd
|
|
Medium |
Right lane closed, two lanes open |
05/08/13 12:00 AM to 08/27/13 11:45 PM |
WisDOT |
Construction - I 43 NORTH SOUTH | HOWARD AVE - VALLEY BRIDGE | I 43/I 94 | MILWAUKEE |
| Exit to Lapham Blvd
|
311.7 |
Medium |
All lanes and shoulders closed |
06/18/13 12:00 AM to 07/08/13 11:45 PM |
WisDOT |
Construction - Detour: Use alt route (Becher exit) |
| WI-38 to Howard Ave
|
311.9 to 314.9 |
Major |
Right two lanes closed, one lane open |
06/20/13 07:00 PM to 06/21/13 05:30 AM |
WisDOT |
Construction - I 43 NORTH SOUTH | HOWARD AVE - VALLEY BRIDGE | I 43/I 94 | MILWAUKEE |
| Lapham Blvd to Howard Ave
|
312.2 to 314.9 |
Medium |
Various lanes closed |
02/14/13 12:00 AM to 06/26/13 11:45 PM |
WisDOT |
Single Lane Closure |
| Entrance from Becher ST
|
312.2 |
Medium |
All lanes and shoulders closed |
06/20/13 07:00 PM to 09:00 PM |
WisDOT |
Construction - Detour: Use alt route (Holt Ave) |
| Exit to Holt Ave
|
314.0 |
Medium |
All lanes and shoulders closed |
02/15/13 12:00 AM to 06/26/13 11:45 PM |
WisDOT |
Construction - Detour: Continue south on I-43 to Howard Ave exit. Exit to EB Howard Ave. East on Howard to Howell St, north on Howell St to Holt. |
| Entrance from National/6th St
|
|
Medium |
All lanes and shoulders closed |
05/06/13 12:00 AM to 08/27/13 11:45 PM |
WisDOT |
Construction - Detour: Use south 6th St to freeway entrance via 5th St |
| I-94 EB to I-43 SB/I-94 EB
|
316.3 |
Medium |
Right lane closed, one lane open |
05/05/13 12:00 AM to 08/27/13 11:45 PM |
WisDOT |
Construction - I 43 NORTH SOUTH | HOWARD AVE - VALLEY BRIDGE | I 43/I 94 | MILWAUKEE |
| College Ave to Rawson Ave
|
318.7 to 319.9 |
Medium |
Left lane closed, two lanes open |
06/19/13 09:30 PM to 06/20/13 05:30 AM |
WisDOT |
Construction - N-S FREEWAY, RAWSON AVE INTERCHANGE | RAWSON AVE & RAMPS | I 94 | MILWAUKEE |
| Exit to Rawson AVE
|
319.3 |
Medium |
All lanes and shoulders closed |
06/15/13 12:00 AM to 10/31/13 11:45 PM |
WisDOT |
Construction - Detour: SB traffic routed to College or Drexel |
| Entrance from Rawson Ave
|
320.2 |
Medium |
All lanes and shoulders closed |
03/11/13 12:00 AM to 10/31/13 11:45 PM |
WisDOT |
Construction - Detour: Interchange detours will be using 27th St, Howell Ave, College Ave, and Drexel Ave |
| 7 Mile Rd to WI-20
|
324.9 to 333.3 |
Medium |
Various lanes closed |
06/20/13 09:00 AM to 02:30 PM daily until 06/21/13 |
WisDOT |
Moving Lane Closure; Maintenance - Pavement Repair |
| 1st St to 12th St
|
337.0 to 339.0 |
Medium |
Right lane closed, two lanes open |
06/17/13 12:00 AM to 06/20/13 11:45 PM |
WisDOT |
Construction - N-S FREEWAY, KEN NORTH ML OVRLY | 2700FT N OF STH 142 - RACINE CNTY LINE | I 94 | KENOSHA |
| 1st St to 12th St
|
337.0 to 339.0 |
Major |
Right two lanes closed, one lane open |
06/19/13 08:30 PM to 06/20/13 05:30 AM |
WisDOT |
Construction - N-S FREEWAY, KEN NORTH ML OVRLY | 2700FT N OF STH 142 - RACINE CNTY LINE | I 94 | KENOSHA |
| 12th St to WI-158
|
339.0 to 342.2 |
Medium |
Various lanes closed |
04/06/13 12:00 AM to 07/15/13 11:45 PM |
WisDOT |
Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA |
| WI-142 to CR-N
|
340.7 to 341.5 |
Medium |
Left lane closed, two lanes open |
03/24/13 08:00 AM to 09/30/13 11:59 PM |
WisDOT |
|
| WI-142 to CR-N
|
340.7 to 341.5 |
Major |
Left two lanes closed, one lane open |
03/24/13 08:00 AM to 09/30/13 11:59 PM |
WisDOT |
|
| WI-158 to Wilmot Rd
|
342.2 to 344.9 |
Major |
Left two lanes closed, one lane open |
03/23/13 12:00 AM to 07/15/13 11:45 PM |
WisDOT |
Construction - N-S FREEWAY, STH 50 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA |
| Clavey Rd to Foster Ave
|
25.3 to 42.4 |
None |
All lanes and shoulders open |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operations |
| Clavey Rd to Kennedy Jct
|
25.3 to 43.0 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 02:00 PM |
IDOT |
Moving Operation |
| Exit to EB Touhy Ave
|
39.8 |
Medium |
All lanes and shoulders closed |
06/03/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
**Long Term Closure** |
| East River Rd to Montrose Ave
|
79.1 to 43.5 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 11:00 AM to 02:00 PM |
IDOT |
Moving Operation |
| Foster Ave to Kimball Ave
|
83.1 to 45.6 |
Minor |
Right shoulder closed, all lanes open |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
|
| Montrose Ave to Ohio St
|
43.5 to 50.3 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Exit to SEB Kennedy Reversibles
|
46.0 |
Major |
All lanes and shoulders closed |
06/20/13 12:00 AM to 06/21/13 05:00 AM |
IDOT |
Slip Ramp to EB Express Lanes at Diversey Closed For Repairs from 12:00 AM Thursday Morning to 5:00 AM Friday Morning |
| Exit to Ohio St
|
50.5 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Ohio St to I-290
|
50.3 to 51.6 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:30 AM to 02:00 PM |
IDOT |
Moving Operation |
| Entrance from Ontario St
|
50.1 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Exit to Adams St
|
51.2 |
Minor |
Ramp work, possible width reduction |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
|
| I-290 to 31st St
|
51.6 to 54.6 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| I-290 to 99th St
|
51.7 to 63.4 |
Medium |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operation; Local Lanes |
| Entrance from Cermak Rd
|
54.6 |
Minor |
Left lane and left shoulder closed, two or three lanes open with ramp work, possible width reduction |
04/08/13 09:00 PM to 09/20/13 11:59 PM |
IDOT |
On Chinatown Feeder; ***Long Term Closure*** |
| 39th St to 63rd St
|
55.6 to 58.7 |
Medium |
Left lane closed, two or three lanes open |
06/19/13 09:00 PM to 06/20/13 06:00 AM |
IDOT |
|
| 39th St to 63rd St
|
55.6 to 58.7 |
Major |
Left two lanes closed, one or two lanes open |
06/19/13 11:00 PM to 06/20/13 06:00 AM |
IDOT |
|
| 75th St to 95th St
|
60.3 to 62.8 |
Medium |
Left lane closed, four lanes open |
06/19/13 09:00 PM to 06/20/13 06:00 AM |
IDOT |
|
| 75th St to 95th St
|
60.3 to 62.8 |
Major |
Left two lanes closed, three lanes open |
06/19/13 11:00 PM to 06/20/13 06:00 AM |
IDOT |
|
| 95th St (US-12) to Dr Martin L King Jr Dr
|
62.8 to 63.7 |
Medium |
Left lane closed, one to four lanes open |
06/19/13 11:59 PM to 06/20/13 06:00 AM |
IDOT |
|
| 107th St to I-80
|
|
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 08:30 AM to 12:30 PM |
IDOT |
Moving Operation |
| Exit to WB 115th St
|
66.3 |
Minor |
Ramp work, possible width reduction |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
|
| Three Oaks Rd to I-94-Br
|
10.3 to 23.3 |
Medium |
Various lanes closed |
05/05/13 07:00 AM to 08/26/13 07:00 PM |
MDOT |
Bridge Repair; Single Lane Closure; Traffic Shift |
I-94 Express EB (Regional)
| Entrance from Cermak Rd
|
54.6 |
Minor |
Left lane and left shoulder closed, two or three lanes open with ramp work, possible width reduction |
04/08/13 09:00 PM to 09/20/13 11:59 PM |
IDOT |
On Chinatown Feeder; ***Long Term Closure*** |
I-94 Reversible EB (Regional)
| Entrance from EB I-90
|
|
Major |
All lanes and shoulders closed |
06/20/13 12:00 AM to 06/21/13 05:00 AM |
IDOT |
Slip Ramp to EB Express Lanes at Diversey Closed For Repairs from 12:00 AM Thursday Morning to 5:00 AM Friday Morning |
I-94 WB (Regional)
| Entrance from M-63
|
26.9 |
Minor |
Ramp work, possible width reduction |
06/20/13 08:00 AM to 05:00 PM |
MDOT |
Erosion, Drainage, Ditch Work |
| I-80 to 107th St
|
|
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 02:00 PM |
IDOT |
Moving Operation |
| 159th St to Dolton Rd
|
72.9 to 70.5 |
Medium |
Left lane closed, two lanes open |
06/19/13 08:00 PM to 06/20/13 05:00 AM |
IDOT |
|
| 159th St to Dolton Rd
|
72.9 to 70.5 |
Medium |
Left two lanes closed, one lane open |
06/19/13 11:00 PM to 06/20/13 05:00 AM |
IDOT |
|
| 99th St to I-290
|
63.4 to 51.7 |
Medium |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operation; Local Lanes |
| 96th St to 79th St
|
62.9 to 60.8 |
Medium |
Left lane closed, four lanes open |
06/19/13 08:00 PM to 06/20/13 05:00 AM |
IDOT |
|
| 96th St to 79th St
|
62.9 to 60.8 |
Medium |
Left two lanes closed, three lanes open |
06/19/13 11:00 PM to 06/20/13 05:00 AM |
IDOT |
|
| at S/O 95th St
|
62.8 |
Minor |
Right shoulder closed, all lanes open |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
|
| 72nd St to 47th St
|
59.9 to 56.7 |
Medium |
Left lane closed, one to four lanes open |
06/19/13 08:00 PM to 06/20/13 05:00 AM |
IDOT |
|
| 72nd St to 47th St
|
59.9 to 56.7 |
Medium |
Left two lanes closed, up to three lanes open |
06/19/13 10:00 PM to 06/20/13 05:00 AM |
IDOT |
|
| Marquette Rd to 63rd St
|
59.3 to 58.7 |
Minor |
Left shoulder closed, all lanes open |
04/01/13 07:00 AM to 07/15/13 11:59 PM |
IDOT |
***Long Term Closure in locals*** |
| 31st St to I-290
|
54.7 to 51.6 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Exit to EB I-290
|
52.4 |
Medium |
Ramp work, possible width reduction |
06/19/13 09:00 PM to 06/20/13 05:00 AM |
IDOT |
|
| I-290 to Ohio St
|
51.6 to 50.4 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 09:30 AM to 01:00 PM |
IDOT |
Moving Operation |
| Exit to Ohio St
|
50.7 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Ohio St to Montrose Ave
|
50.3 to 43.5 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 11:00 AM to 02:00 PM |
IDOT |
Moving Operation |
| Entrance from Ontario St
|
50.1 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Montrose Ave to East River Rd
|
43.5 to 79.2 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 10:00 AM to 01:00 PM |
IDOT |
Moving Operation |
| Kennedy Jct to Clavey Rd
|
43.0 to 25.3 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/20/13 09:30 AM to 02:00 PM |
IDOT |
Moving Operation |
| Foster Ave to Clavey Rd
|
42.4 to 25.3 |
None |
All lanes and shoulders open |
06/20/13 09:00 AM to 03:00 PM |
IDOT |
Moving Operations |
| Exit to WB Touhy Ave
|
39.8 |
Medium |
All lanes and shoulders closed |
06/03/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
**Long Term Closure ** |
| at Waukegan Plaza
|
4.8 |
Medium |
Various lanes closed |
06/19/13 11:00 PM to 06/20/13 05:00 AM |
Illinois Tollway |
Moving Operation; ORT Maintenance; All ORT Lanes Closed |
| WI-165 to WI-158
|
346.6 to 342.3 |
Medium |
Various lanes closed |
04/06/13 12:00 AM to 07/20/13 11:45 PM |
WisDOT |
Construction - N-S FREEWAY, STH 50 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA |
| Entrance from WI-50
|
343.0 |
Medium |
All lanes and shoulders closed |
04/06/13 12:00 AM to 07/15/13 11:45 PM |
WisDOT |
Construction - Detour: Take STH 50 to 125th Street. Turn left on 125th Street. Continue to 77th Street. Turn left on 77th Street. Continue to WFR. Turn right on WFR. Continue to CTH C. Turn left on CTH C. Continue to CTH C SE ramp. |
| Exit to WI-158
|
343.0 |
Major |
All lanes and shoulders closed |
04/06/13 12:00 AM to 07/15/13 11:45 PM |
WisDOT |
Construction - Detour: Continue to 142 SE ramp. Take 142 SE ramp. Turn left onto STH 142. Continue to WFR. Take WFR to STH 158. Turn left onto STH 158. |
| WI-158 to 12th St
|
342.3 to 339.2 |
Medium |
Various lanes closed |
04/06/13 12:00 AM to 07/15/13 11:45 PM |
WisDOT |
Construction - N-S FREEWAY, STH 142 INTERCHANGE | MAINLINE & RAMPS | I 94 | KENOSHA |
| CR-N to WI-142
|
341.5 to 340.7 |
Medium |
Left lane closed, two lanes open |
03/23/13 08:00 AM to 09/30/13 11:59 AM |
WisDOT |
|
| at WI-142
|
340.7 |
Medium |
Left lane closed, two lanes open |
03/22/13 09:30 PM to 10/31/13 11:00 PM |
WisDOT |
***Long Term Closure***; Two lanes will be open to traffic in this section through the year. |
| WI-142 to 1st St
|
340.4 to 336.9 |
Medium |
Right lane closed, two lanes open |
06/17/13 12:00 AM to 06/27/13 11:45 PM |
WisDOT |
Construction - N-S FREEWAY, KEN NORTH ML OVRLY | 2700FT N OF STH 142 - RACINE CNTY LINE | I 94 | KENOSHA |
| WI-142 to CR-KR/1st St
|
340.4 to 336.9 |
Major |
Right two lanes closed, one lane open |
06/19/13 08:30 PM to 06/20/13 05:30 AM daily until 06/20/13 |
WisDOT |
Construction - N-S FREEWAY, KEN NORTH ML OVRLY | 2700FT N OF STH 142 - RACINE CNTY LINE | I 94 | KENOSHA |
| Drexel Ave to Rawson Ave
|
320.6 to 319.4 |
Medium |
Left lane closed, two lanes open |
06/19/13 09:30 PM to 06/20/13 05:30 AM |
WisDOT |
Construction - N-S FREEWAY, RAWSON AVE INTERCHANGE | RAWSON AVE & RAMPS | I 94 | MILWAUKEE |
| Entrance from CR-BB
|
319.0 |
Medium |
All lanes and shoulders closed |
03/11/13 12:00 AM to 10/31/13 11:45 PM |
WisDOT |
Construction - Detour: NB loop ramp is closed. Detour will be provided |
| Entrance from Rawson AVE
|
319.0 |
Medium |
All lanes and shoulders closed |
05/13/13 12:00 AM to 09/20/13 11:45 PM |
WisDOT |
Construction - Detour: Signed detour will be posted |
| Howard Ave to 6th St
|
315.0 to 311.7 |
Major |
Left two lanes closed, one or two lanes open |
06/19/13 09:00 PM to 06/20/13 05:30 AM |
WisDOT |
Construction - I 43 NORTH SOUTH | HOWARD AVE - VALLEY BRIDGE | I 43/I 94 | MILWAUKEE |
| Howard Ave to Canal St
|
315.0 to 310.9 |
Medium |
Various lanes closed |
02/12/13 12:00 AM to 06/26/13 11:45 PM |
WisDOT |
Single Lane Closure |
| Entrance from Holt Ave
|
313.0 |
Medium |
All lanes and shoulders closed |
02/12/13 12:00 AM to 06/26/13 11:45 PM |
WisDOT |
Construction - Detour: EB Holt to NB Chase to NB 1st St to WB Lincoln Ave to NB 4th St to B 43 via Becher St entrance ramp. |
| Exit to WB I-94
|
310.9 |
Major |
All lanes and shoulders closed |
06/19/13 09:30 PM to 06/20/13 05:30 AM |
WisDOT |
Construction - Detour: From I-43 exit to Layton Ave. From Layton Ave. turn north on STH 100. From STH 100 turn east on W.National Ave. From W.National Ave. enter IH 894. |
| Exit to EB I-894
|
304.6 |
Major |
All lanes and shoulders closed |
06/20/13 11:00 PM to 06/21/13 04:30 AM |
WisDOT |
Construction - Detour: From I-94 east exit and turn south on S.84th St. From S.84th St. turn west on W.National Ave. From W.National Ave. turn south on STH 100. From STH 100 turn east on W.Beloit Rd. From W.Beloit Rd.enter US 45 south. |
| Exit to NB WI-100
|
303.8 |
Major |
All lanes and shoulders closed |
04/06/13 12:00 AM to 08/10/13 11:45 PM |
WisDOT |
Construction - Detour: Use 45 North to Bluemound Ave./ exit 39. Take a right onto WB Bluemound Ave. and continue to HWY 100/ Mayfair Road. |
| Milwaukee St to US-51
|
138.5 to 132.2 |
Medium |
Various lanes closed |
06/16/13 10:00 PM to 06/21/13 05:00 AM, 06/23/13 10:00 PM to 06/28/13 05:00 AM, 06/30/13 10:00 PM to 07/05/13 05:00 AM, 07/07/13 10:00 PM to 07/12/13 05:00 AM, ... more, ending on 08/18/13 |
WisDOT |
Construction - Detour: N/A |
| CR-I to CR-I
|
126.3 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/19/13 09:00 PM to 06/20/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |
| CR-I to CR-I
|
126.3 to 126.1 |
Major |
Left two lanes closed, one lane open |
06/20/13 09:00 PM to 06/21/13 05:00 AM |
WisDOT |
Construction - MADISON - PORTAGE | CTH I OVERPASS | I 39 | DANE |
|