Construction Report
Select Location
  
Updated: 12/22/14 12:01 AM

Reports Help

Use these links to view other reports for the selected location: travel times / incidents / construction / special events / congestion / dynamic message signs / cameras / detectors

NOTE: You may place the mouse over a location to see its municipality and county, or click on the location to see a map of the event.

Construction information transmitted by the Illinois Tollway for display on the Jane Addams Memorial (Northwest) EB and Jane Addams Memorial (Northwest) WB reports of the Travel Midwest website does not include "shoulder only" projects. For more information on "shoulder only" closures, please visit the Tollway website at www.illinoistollway.com.

Jane Addams Memorial (Northwest) EB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***
Stone Quarry Rd (+1.2 miles) to Genoa Rd (+0.8 miles) 24.0 to 25.8 Medium Right lane closed, one or two lanes open 12/22/14 7:00 AM to 9:00 AM Illinois Tollway New Interchange
Stone Quarry Rd (+1.2 miles) to Genoa Rd (+0.8 miles) 24.0 to 25.8 Major Right two lanes closed, up to one lanes open 12/22/14 9:00 AM to 1:00 PM Illinois Tollway New Interchange
Stone Quarry Rd (+1.2 miles) to Genoa Rd (+0.8 miles) 24.0 to 25.8 Medium Right lane closed, one or two lanes open 12/22/14 1:00 PM to 3:00 PM Illinois Tollway New Interchange
IL-23 (-0.1 miles) to IL-23 (+0.4 miles) 36.0 to 36.5 Minor Right lane closed, one lane open 12/22/14 2:00 AM to 5:00 AM Illinois Tollway Rdwy Widening and Reconst.
IL-23 (-0.1 miles) to Getty Rd 36.0 to 37.5 Medium Right lane closed, one to three lanes open 12/22/14 5:00 AM to 7:00 PM Illinois Tollway Rdwy Widening and Reconst.
Beverly Rd to Canadian National RR 57.8 to 58.6 Minor All lanes shifted 4/24/14 12:00 AM to 3/31/15 11:59 PM Illinois Tollway ***Long Term***; All Lanes Shifted Left.
Entrance ramp from Beverly Rd 58.6 Minor Partial closure 4/28/14 9:00 AM to 3/31/15 11:59 PM Illinois Tollway Right Side of Ramp Closed; ***Long Term Closure***
IL-59 (-0.2 miles) to IL-72 (-0.4 miles) 59.5 to 60.9 Medium Left lane closed, two lanes open 12/22/14 9:00 AM to 3:00 PM Illinois Tollway Bridge Reconstruction
Ramp from EB I-90 to NB IL-53 68.2 Minor Various lanes closed 8/20/14 7:00 AM to 12/31/14 11:59 PM Illinois Tollway Toll Plaza Maintenance; Left IPO Lane Closed; ***Long Term Closure***
Entrance ramp from NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 10/30/14 7:00 AM to 12/30/14 11:59 PM Illinois Tollway *** Long Term Clsoure ***; Detour posted
Mt Prospect Rd (-0.4 miles) to Mt Prospect Rd (+0.1 miles) 74.3 to 74.8 Medium Right lane closed, two lanes open 12/22/14 6:00 PM to 7:00 PM Illinois Tollway Grading, Retaining Walls and Storm Sewer

Jane Addams Memorial (Northwest) WB (Illinois)
Location Mile Marker Severity Closure Details Time Periods Source Description
Exit ramp to NB Elmhurst Rd 73.8 Medium All lanes and shoulders closed 10/30/14 7:00 AM to 12/30/14 11:59 PM Illinois Tollway *** Long Term Closure ***; Detour posted
Exit ramp to NB Arlington Heights Rd 71.1 Minor Partial closure 8/8/14 12:00 AM to 12/22/14 11:59 PM Illinois Tollway Retaining Wall Construction
Exit ramp to Roselle Rd 66.0 Minor Partial closure 6/17/14 5:00 AM to 3/15/15 11:59 PM Illinois Tollway ***Long Term Closure***; Right IPO Lane Closed
Harmony Rd (+0.8 miles) to Anthony Rd (+0.4 miles) 34.5 to 33.0 Medium Right lane closed, two lanes open 12/22/14 7:00 AM to 5:00 PM Illinois Tollway Rdwy Widening and Reconst.
Genoa Rd to Belvidere Plaza 25.0 to 23.3 Minor Right lane closed, one to three lanes open 12/22/14 5:00 AM to 7:00 AM Illinois Tollway Pavement Widening and Reconstruction
at Belvidere Plaza 23.4 to 23.3 Minor Various lanes closed 12/22/14 6:00 AM to 3:30 PM Illinois Tollway Pavement Widening and Reconstruction; Right ORT lane closed
Belvidere Plaza to US-20 Bypass (+1.4 miles) 23.3 to 18.4 Minor Right lane closed, one to four lanes open 12/22/14 6:00 AM to 3:30 PM Illinois Tollway Pavement Widening and Reconstruction
US-20 Bypass (+1.3 miles) to US-20 Bypass (+1.9 miles) 18.5 to 17.9 Major Right two lanes closed, one lane open 12/21/14 7:00 PM to 12/22/14 5:00 AM Illinois Tollway Bridge Replacement; There will be THREE (3) 15 minute WB FULL CLOSURES with Trooper Assistance @ 12:01 AM, 12:30 AM & 1:00 AM
at South Junction I-39/90/US-51 17.3 Minor All lanes and shoulders open 3/28/13 7:00 AM to 12/31/14 11:59 PM IDOT Size & Weight restrictions - Obtain required permit from Toll Authority 630-241-6800. Max height: 14 ft 6 in, max width 12 ft 0 in; ***Long Term Closure***

Site Contributors | Requirements | Policies | Disclaimer | Glossary | Contact Us
Please send comments, suggestions, or requests for help to Travel Midwest webmaster.
Much of this site's functionality makes use ofcookies and JavaScript.
Mon Dec 22 00:56:35 CST 2014