NOTE: You may place the mouse over a location to see its municipality and county,
or click on the location to see a map of the event.
I-190 WB (Illinois)
| East River Rd to I-294
|
79.1 to 77.9 |
Minor |
Right lane closed, one or two lanes open |
06/18/13 11:00 PM to 06/19/13 05:00 AM |
IDOT |
|
| East River Rd to Bessie Coleman Dr
|
79.1 to 77.0 |
Medium |
Left lane or right lane and both shoulders closed with ramp work, possible width reduction |
06/19/13 09:30 AM to 01:00 PM |
IDOT |
Moving Operation |
| East River Rd to Bessie Coleman Dr
|
79.1 to 77.0 |
Minor |
Both shoulders closed, all lanes open with ramp work, possible width reduction |
04/15/13 07:00 AM to 07/31/13 11:59 PM |
IDOT |
**Long Term Closure ** Closed shoulder, traffic on milled surface. |
| Entrance from NB I-294
|
78.1 |
Minor |
Various lanes closed |
06/19/13 03:00 PM to 07/18/13 11:59 PM |
Illinois Tollway |
Pavement Repair; Shoulder Work; Right Cash, Right IPO Lanes Closed; ***Long Term Closure*** |
| Entrance from NB I-294
|
78.1 |
Medium |
Various lanes closed |
06/19/13 09:00 AM to 03:00 PM |
Illinois Tollway |
Pavement Striping; Left Cash, Left IPO Lane Closed |
| Entrance from NB I-294
|
78.1 |
Minor |
Right lane closed, one lane open |
06/16/13 12:00 AM to 07/18/13 12:00 AM |
Illinois Tollway |
Ramp Reconstruction |
| I-294 to Bessie Coleman Dr
|
77.9 to 77.0 |
Medium |
Right two lanes closed, up to one lanes open |
06/18/13 11:00 PM to 06/19/13 05:00 AM |
IDOT |
|